Completed Projects

Project Name Scope Site Qty Year Customer Country Project Status
Eltek Rectifier Project Rectifier SWAP 100 2013=2014 BASE Tech Bangladesh Completed
GP BC TRx Expansion Project TRx Expansion 150 2014-2015 Ericson Bangladesh Completed
BRO NTD composite Project Network Upgradation 750 2014-2015 Huawei Bangladesh Completed
Robi Asset Verification Project Asset tagging & survey 2500 2014-2015 e.co Bangladesh Completed
GP BC SWAP (Blue Chattala) BTS SWAP 150 2015-2016 Ericson Bangladesh Completed
Robi CC SWAP Project BTS SWAP 200 2015-2016 Ericson Bangladesh Completed
Banglalink Mega Project 2G, 3G, MW, SWAP, AbOIP 4500 2015-2017 Huawei Bangladesh Completed
Western Zone Scada Project, GTCL UHF & MW Installation & commissioning 45 2016-2017 L&T Bangladesh Completed
Core site asset tagging Asset tagging & survey 30 2016 Robi Bangladesh Completed
Bangladesh Robi Moon Project LTE installation 2000 2018 Huawei Bangladesh Completed
GP Blue Speed Project LTE installation 1000 2018 Huawei Bangladesh Completed
Banglalink FLM Project Complete O&M service 1800 2016-2017 Huawei Bangladesh Completed
Bangladesh Teletalk 211 Mini CME Civil Project Civil site with MDB 350 2014-2016 Huawei Bangladesh Completed
Bangladesh GP one asia RAN project DWDM installation 450 2016-2017 Huawei Bangladesh Completed
TashiCell Backbone MW Project MW installation 25 2014 Huawei Bhutan Completed
TashiCell Power Protection System Installation Project Power system installation 45 2007-2008 Huawei Bhutan Completed
Tashi InfoComm Ltd., Bhutan, Phase II Lot-A Expansion Project Expansion 150 2007-2008 Huawei Bhutan Completed
Bhutan TICL 3G Project Core, Acces Datacom 300 2007-2008 Huawei Bhutan Completed
Bhutan TICL Rural Network Expansion Power Equipment Project Power Expansion 450 2007-2008 Huawei Bhutan Completed
Tashi InfoComm Ltd., Bhutan, Phase II Lot-B Expansion Project Expansion 1250 2007-2008 Huawei Bhutan Completed
Bhutan TICL Power supply system up gradation at MSC site Power System Upgradation 750 2007-2008 Huawei Bhutan Completed
Bhutan Telecom Triple Play Soft switch Project Installation & Commissioning for BSC & BTS 1000 2007-2008 Huawei Bhutan Completed
MPT-KSGM 2G Swap Project 2G Swap 250 2014 Huawei Myanmar Completed
MPT-KSGM CME Project Core Installation 45 2014-2015 Huawei Myanmar Completed
MPT-KSGM Power Survey Project Power System Survey 750 2016-2017 Huawei Myanmar Completed
MPT-KSGM Facility Project Installation & repair 750 2016-2017 Huawei Myanmar Completed
Oredoo Core & Data Center Project Core & Data Center Installation 21 2016-2017 Huawei Myanmar Completed
Telenor Smart Solution Project TE Container Installation 10 2016-2017 Huawei Myanmar Completed
MPT-KSGM Core Project BSC, MSC Installation 5 2018 Huawei Myanmar Completed
Telenor 2G & 3G Project 2G & 3G Expansion 1200 2015-2016 Ericsson Myanmar Completed
Telenor Solar Trial Project Solar Installation 70 2017 Telenor Myanmar Completed
MPT-KSGM NPM Project Resource Supply: DA Engineer, DT Engineer and Rigger 21 Team
Huawei Myanmar Completed
MPT-KSGM RF Delivery Project Single Site Verification 200
Huawei Myanmar Completed
MPT-KSGM RF Delivery Project Cluster KPI Optimization 200
Huawei Myanmar Completed
Grameenphone 3G Optimization Project Single Site Verification 1010
Huawei Bangladesh Completed
Grameenphone 3G Optimization Project Cluster KPI Optimization 1010
Huawei Bangladesh Completed
Banglalink Mega Project (3G) Single Site Verification 696
Huawei Bangladesh Completed
Banglalink Mega Project (3G) Cluster KPI Optimization 607
Huawei Bangladesh Completed
Banglalink Mega Project Benchmark Drive Test 554
Huawei Bangladesh Completed
(2G Swap) Cluster DT KPI Optimization 456
Huawei Bangladesh Completed
Airtel 3G Project OSS KPI Optimization 456
Huawei Bangladesh Completed
Airtel 3G Project Single Site Verification 508
Huawei Bangladesh Completed
Robi 3G Project Cluster KPI Optimization 111
Huawei Bangladesh Completed
Robi 3G Project Single Site Verification 76
Huawei Bangladesh Completed
Banglalink 2G/3G Site Integration Cluster KPI Optimization 82
Huawei Bangladesh Completed
Banglalink 2G/3G Site Integration Site Integration (2G) 200
Banglalink Bangladesh Completed
Banglalink 2G/3G Site Integration Site Integration (3G) 350
Banglalink Bangladesh Completed
Grameenphone Survey Project RF/Area Survey 492
Grameenphone Bangladesh Completed
Robi RNPO Resource Supply DT Engineer and Planning Engineer Supply 6 Teams
Robi Bangladesh Completed
Banglalink Trouble Ticketing Access Trouble Ticketing 160
Banglalink Bangladesh Completed
Teletalk 3G Introduction and 2G Expansion Site Audit, Network Planning and Cluster DT 220
Teletalk Bangladesh Completed